Trail Work

11/15/18  Will be putting down plywood on the bridge at Peters Hunting camp for better protection against studs and ski scags

10/27/18  Went through the Long Pond Loop removing blow downs

10/26/18  Went from Flugertown Rd to Mongaup cutting out blow downs.  Mostly dead stuff across the trail. There were some washouts,  did fill one in with logs cut from blow downs.  There still is a large tree down on the long pond trail also couple bridges need to have support posts reinstalled.